Traffic jam in project
With the upcoming of summer holidays, we can share with you some feedbacks about these major French step of the year : Usually, you have missing elements in your lugguage or a lack of organization about what you would like to do in this period. Even « do nothing » requires some specific organization. To these guys, … Continued
With the upcoming of summer holidays, we can share with you some feedbacks about these major French step of the year :
- Some of you may choose to Brexit their departure (or leave at last moment).
Usually, you have missing elements in your lugguage or a lack of organization about what you would like to do in this period. Even « do nothing » requires some specific organization.
- Other will leave as soon as possible to avoid trafic jam, arrive earlier to ensure to the 1st ones in the swimming pool or at beach !
To these guys, I say Good job!
However, do not forget to have break in your road-trip and do not wast this break time because you are going to overconsume the buffer you had at the beginning of your road-trip.
- For those, who will leave the latest, your journey will be long.
But in holidays, it is not always the distance to do which is difficult, it can be the waiting time at the toll which generate big bottlenecks ! Do not mix distance to drive and the limited capacity of some checkpoint in your travel.
- It is good to have busy kids in the road-trip. Less noise is far better to stay focus on the road.
However, do not spend that peaceful period in multitasking : Do not check your phone, play with the radio, change the A/C, etc. Keep focus on your main action during this journey : Drive.
I hope you will have recognize some key practices in project management we have shared with you for 4 years now.
During this summer period, a new release of the critical chain book will happen.
If you look for some reading and you still have some empty spaces in your luggage, it is good investment.
If you prefer doing something else, it is ok. We will be ready to welcome you for our 1 day discovery of this methodology.
See you soon and take care of you and your family.
Topics
Go further
Related articles
Flow Project Management
S02-E05 Managing the Load / Capacity of the Softs (the continuation of the precisely wrong)
At this point, everything is going well: But, there are several projects that use the same resources. So, how do you manage this? Most people will tell you that having a project management tool that collects load and capacity will help you drive your choices. This is simply not true. Most load / capacity tools … Continued
Flow Project Management
S02-E04 How do I focus on the right tasks for my project?
Once you have completed your project plan, sized the tasks and avoided creating a labyrinthine system with too much detail, you need to move on to the step that will identify the most time critical task sequence. At this point, we recommend that you use the critical chain approach. Unlike the critical path approach, which … Continued
Flow Project Management
S02-E03 The world of precisely wrong with the project plan
You made your project plan (episode 1). Then you verified that it was at the right level of detail (episode 2)... knowing that there is an uncertainty that you will discover. How will/should you incorporate these elements into the project plan update? Whoa, slow down! We are going to integrate EVERYTHING into the schedule, aren't … Continued
Does this article resonate?
Let's talk about your situation.
Our consultants help you translate these reflections to your Supply Chain and your teams — diagnosis, scoping or operational delivery.